InicioProyectos

PASTERAL I DAM

Drafting of the “preliminary draft renovation of the Pasteral catchment and catchment siphon” and drafting of the “construction project of a submerged wall 2 m high” to protect the installations and the mouth water intakes in the Pasteral reservoir

Servicios

No servicios

Sectores

Water and Environment

Fecha

2022 - 2022

Ubicación

La Cellera de Ter

OUR CHALLENGE

As a result of the sedimentations in the Pasteral I reservoir and, aggravated by the storm Gloria that occurred in 2018, the mouthwater collection system may be compromised or cause problems in the subsequent aqueduct due to sedimentation or suspended solids that may occur due to problems cleaning the grilles without the need to lower the level of the reservoir with the environmental problems that may arise.

POSITIVE IMPACT

Ensure the installation of the water intake for a large part of the citizens of Catalonia by developing a water protection project while developing a previous phase of a future, larger project that goes along the lines of improving these critical and necessary facilities.

ÚLTIMOS PROYECTOS

Únete a nosotros

Demos forma al futuro juntos.